Image

  PL   /   EN   /   sekretariat@controltec.pl    /    tel: +48 71 798 49 05       Kompleksowa automatyka dla przemysłu

GiEK S.A.

GiEK S.A.

Turnkey construction of two heavy oil (mazut oil) preparation facilities at PGE Elektrownia Dolna Odra and PGE Elektrownia Opole power plants. Comprehensive implementation of the construction, technology, electrical industries and measurement systems.

GiEK S.A. – EC Zgierz

GiEK S.A. – EC Zgierz

Construction of a steam turbine control system along with a heat exhaust system based on the Siemens SPPA-T3000 system.

Tameh – ZW Nowa

Tameh – ZW Nowa

Comprehensive automation of an industrial boiler plant comprising 5 OPG230 boilers and one OPG 430 boiler, along with the implementation of a master control and stabilization system for the steam collector. The project was implemented on a Siemens PCS7 system.  

KGHM Głogów

KGHM Głogów

Development and implementation of the comprehensive waste heat boiler control system based on Schneider systems.

PL / EN